Methodology
How the two tools work: formulas, default assumptions with their sources, the storage model's fit and back-test, and the limitations. Calculations run in tested code modules, separate from the page code.
Data sources and refresh
A scheduled job fetches all data at 07:00 UTC. Each source is checked (freshness, gaps, value ranges) before it replaces the previous file. If a check fails, the last good data stays live with its date.
| Data | Source | Frequency | Attribution | Last successful refresh |
|---|---|---|---|---|
| Henry Hub spot | EIA API v2, series RNGWHHD | Daily | Source: EIA | 21 Nov 2026, 10:47 UTC |
| EUR/USD | ECB euro foreign exchange reference rates | Working days | Source: ECB | 21 Nov 2026, 10:47 UTC |
| EU gas storage | GIE AGSI+, EU aggregate | Daily | Source: GIE AGSI+ | 21 Nov 2026, 10:47 UTC |
| EU LNG send-out | GIE ALSI, EU aggregate | Daily | Source: GIE ALSI | 21 Nov 2026, 10:47 UTC |
| Temperatures | Open-Meteo forecast and historical APIs, 16 cities | Daily | Weather data: Open-Meteo (CC BY 4.0) | 21 Nov 2026, 10:47 UTC |
Weather data by Open-Meteo.com, licensedCC BY 4.0. The EU temperature is a gas-demand-weighted average of 16 cities, weighted by Eurostat 2024 inland gas consumption. TTF and JKM are not fetched: no licensed price assessments are used.
LNG netback calculator
All prices in $/MMBtu. Formulas run in a tested module (site/src/lib/netback.ts).
- TTF in $/MMBtu = TTF (€/MWh) × EUR/USD ÷ 3.412
- Laden days = distance (nm) ÷ (speed (knots) × 24). Round trip = 2 × laden days. The ship returns in ballast over the same distance.
- Loaded MMBtu = vessel size (m³) × conversion factor (MMBtu/m³)
- Delivered MMBtu = loaded MMBtu × (1 − boil-off rate × laden days)
- Shipping cost = (charter rate × round-trip days + canal fee × 2 + port costs) ÷ delivered MMBtu
- Boil-off cost = loaded MMBtu × boil-off rate × laden days × destination price ÷ delivered MMBtu
- FOB netback = destination price − shipping cost − boil-off cost
- Cost of supply = feedgas multiplier × Henry Hub + liquefaction fee
- Full-cost margin = FOB netback − cost of supply
- Lift/cancel margin = FOB netback − feedgas multiplier × Henry Hub. Lift/cancel margin leaves out the liquefaction fee, which is owed whether or not the cargo is lifted, so it shows whether lifting beats cancelling.
- Arb = best Asia netback − Europe netback
- Breakeven JKM: each Asia netback is linear in JKM, so the breakeven is solved exactly. It is the lowest JKM at which any Asia route matches the Europe netback.
- Breakeven charter rate: the charter rate at which the arb is zero, found numerically.
Simplifications
- One charter rate for all routes. In practice Pacific and Atlantic rates differ.
- Boil-off applies to the laden leg only. Heel and fuel use on the ballast leg are not modelled.
- The full vessel capacity is loaded. The fill limit (about 98.5%) and heel are ignored.
- Tokyo Bay is the North Asia reference port. Canal fees average the laden and ballast tolls.
- Canal waiting times, congestion and Red Sea security costs are not included.
Default assumptions and sources
Verified on 21 Nov 2026. Henry Hub and EUR/USD refresh daily. Full notes in assumptions_sources.md.
| Input | Default | Unit | As of | Source |
|---|---|---|---|---|
| Henry Hub spot | 3.1 | $/MMBtu | 17 Nov 2026 | EIA, Henry Hub Natural Gas Spot Price (RNGWHHD) |
| TTF front-month | 85 | EUR/MWh | 20 Nov 2026 | Manual. Indicative round level from public press reports of the Dec-26 contract (EUR 85 to 86/MWh). Not a licensed assessment. |
| North Asia spot LNG (JKM proxy) | 27 | $/MMBtu | 20 Nov 2026 | Manual. Indicative round level from public press reports of the weekly North-east Asia spot LNG average for January delivery ($26.90/MMBtu). Not a licensed assessment. |
| EUR/USD | 1.099 | USD per EUR | 20 Nov 2026 | ECB euro foreign exchange reference rate |
| Charter rate (174k m3, two-stroke, Atlantic spot) | 35,000 | $/day | 18 Nov 2026 | Public weekly shipping commentary: Atlantic two-stroke $38,400/day (week 45) and $33,200/day (week 46), 2026 |
| Vessel cargo capacity | 174,000 | m3 | 21 Nov 2026 | Industry standard newbuild size (IIR, 'The future standard for energy-saving LNG carriers') |
| Conversion factor | 23.4 | MMBtu per m3 LNG | 21 Nov 2026 | 0.45 t/m3 LNG density x 52 MMBtu/t (common industry factors). Gasgrid Finland conversion table gives 24.02 (+2.6%). |
| Boil-off rate (laden) | 0.085 | % per day | 21 Nov 2026 | Modern membrane carrier benchmark 0.085%/day (Gas Carrier Update 2015, Univ. Hamburg); Argus cites 0.08%/day for a typical two-stroke carrier |
| Vessel speed | 17 | knots | 21 Nov 2026 | Implied by Kpler voyage times (via MET Group, 2023): 22 days via Panama, 35 via Suez, 38 via Cape, which equal 17.2 to 17.4 knots on the distances below |
| Panama Canal fee | 640,000 | $ per transit | 21 Nov 2026 | Panama Canal Authority tolls page: Neopanamax LNG fixed $300,000/transit + $2.05/m3 capacity, ballast 85% of tolls, mandatory Neopanamax tug $30,000. Average of laden and ballast for 174,000 m3. |
| Suez Canal fee | 450,000 | $ per transit | 21 Nov 2026 | Nominal LNG carrier toll about $397,000 (Argus table, undated) plus SCA temporary surcharge for LNG carriers raised to 19% from 15 July 2026. Rebates for US Gulf to Asia vary. Low confidence. |
| Port and other costs | 250,000 | $ per voyage | 21 Nov 2026 | US Gulf load port under $70,000/call (Wood Mackenzie via Riviera, 2025) plus discharge port about $150,000 to $250,000 (Platts port-cost notes, 2024), plus agency and sundries |
| Liquefaction fee | 2.75 | $/MMBtu | 21 Nov 2026 | Cheniere Q4 2025 call: pricing above midpoint of $2.50 to $3.00 range (via S&P Global, 2026); Argus Dec 2025 indicative benchmark $3.00 |
| Feedgas multiplier | 115 | % of Henry Hub | 21 Nov 2026 | Cheniere Sabine Pass SPAs: 115% of Henry Hub plus fixed fee (SEC filings) |
| Distance: NWE direct | 5,300 | nm | 21 Nov 2026 | Sabine Pass to Gravelines 5,152 nm (Sealagom) plus about 150 nm to Rotterdam; ports.com gives 5,657 nm |
| Distance: Asia via Panama | 9,209 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Panama, 9,209 nm (Riviera Maritime Media); S&P Global gives 9,214 nm |
| Distance: Asia via Suez | 14,521 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Suez, 14,521 nm (Riviera, citing sea-distances.org); S&P Global gives about 14,500 |
| Distance: Asia via Cape | 15,689 | nm | 21 Nov 2026 | Sabine Pass to Tokyo via Cape of Good Hope, 15,689 nm (S&P Global, 2016) |
TTF and JKM defaults are entered by hand from public press reports and are indicative only. No licensed price assessments are used. Enter your own levels.
EU gas storage forecast
Daily EU net withdrawal is modelled from heating degree days (HDD) and LNG send-out. The model is fitted on daily data for the winters 2021/22 to 2025/26 (1 October to 31 March).
Net withdrawal (TWh/d) = a + b × HDD + c × (LNG send-out − winter average)
| Term | Estimate | Std. error | Unit |
|---|---|---|---|
| a, intercept | −2.814 | 0.108 | TWh/d |
| b, per HDD | +0.704 | 0.012 | TWh/d per HDD |
| c, LNG deviation | −0.175 | 0.099 | TWh/d per TWh/d |
R² 0.80, root mean square error 1.36 TWh/d, 911 days.
- HDD = max(0, 15.5 °C − EU mean temperature). The EU temperature is a gas-demand-weighted average of 16 cities in 12 countries, which use 91% of EU gas.
- Each day: storage = previous storage − net withdrawal, kept between 0 and the working gas volume.
- Forecast days use the forecast as is. Later days use the average HDD of the winters 2016/17 to 2025/26 for that calendar day, with each year's temperature shifted by the scenario.
- LNG scenario: send-out changes by the chosen % of the last 30 days' average.
- Supply disruption: adds the chosen TWh/d to withdrawal over its dates.
- Demand response: cuts withdrawal by the chosen % of average EU daily demand (GIE annual consumption ÷ 365).
Back-test: winter 2025/26
The model was refitted on 2020/21 to 2024/25 and run through winter 2025/26. Actual storage on 31 March was 313.8 TWh (27.7% full).
| Projection from | Error, actual weather (TWh) | Error, actual weather (pp) | Error, normal weather (TWh) |
|---|---|---|---|
| 1 Oct 2025 | +58.8 | +5.2 | +62.2 |
| 1 Nov 2025 | +37.0 | +3.3 | +31.3 |
| 1 Jan 2026 | +16.8 | +1.5 | +10.3 |
Error = projected minus actual storage on 31 March. Positive means the model left too much gas in storage. With actual weather the model still under-predicted withdrawals that winter, so treat projections as a stress test, not a forecast.
Likely range
The headline and the preset table show a likely range of projection ± the back-test error, in percentage points of working gas volume. For each back-test start date the larger of the two errors (actual or normal weather) is used. The width grows linearly with the days left to 31 March, from zero on 31 March to 5.5 points from 1 October. The range is symmetric: the projection is not bias-corrected, so the low bias seen in 2025/26 is stated, not adjusted for. It rests on one winter's back-test and is a guide, not a confidence interval.
Limitations
- No price response: high prices that cut demand or attract LNG are only captured through the scenario sliders.
- No withdrawal capacity limit as storage empties.
- Pipeline imports are not modelled separately; they sit in the intercept.
- EU aggregate only. Country storage can diverge sharply.
Data: GIE AGSI+ and GIE ALSI, updated daily. Weather data by Open-Meteo.com (CC BY 4.0), daily mean 2 m temperature.